VECTOR FREE MARLBOROUGH
  • Home
  • About Us
    • Vision, Mission & Values
  • Why Us?
  • Services
    • Control methodology
    • Access Permission - Landowners / Occupiers
    • Signage & Public Notification
  • Current Operations
    • Aerial 1080 Operations >
      • Completed Aerial 1080 Operations
    • Ground Operations - Animal Pests >
      • Possum Control - TBfree NZ
      • Predator Control >
        • Tunnel 21 wetland trapping programme
        • Tennyson Inlet Islands Rodent Control
  • Health & Safety
  • Quality Assurance
  • Contact

​2025 Abel Tasman aerial

Location:  Tasman District
Project area:  15,000 hectares (approx.)


View the factsheet for this project.
Client:  Project Janszoon
​
Status:  Aerial application of bait containing the toxin sodium fluoroacetate (1080) was completed on 12 September 2025.

People entering the area during the post operation caution period are advised to comply with all precautions stated on toxin warning signage.

Picture
Knowledge, Skill, Integrity, ​​Sensitivity, Sustainability
Picture
Photographs supplied by Matt Winter
​www.wildnaturenewzealand.co.nz
Instagram  -  ‘wildnaturenewzealand’
Youtube   -  ‘Into the Wind - Matt Winter Photography’
Proudly powered by Weebly
  • Home
  • About Us
    • Vision, Mission & Values
  • Why Us?
  • Services
    • Control methodology
    • Access Permission - Landowners / Occupiers
    • Signage & Public Notification
  • Current Operations
    • Aerial 1080 Operations >
      • Completed Aerial 1080 Operations
    • Ground Operations - Animal Pests >
      • Possum Control - TBfree NZ
      • Predator Control >
        • Tunnel 21 wetland trapping programme
        • Tennyson Inlet Islands Rodent Control
  • Health & Safety
  • Quality Assurance
  • Contact