VECTOR FREE MARLBOROUGH
  • Home
  • About Us
    • Vision , Mission & Values
  • Why Us?
  • Services
    • Control methodology
    • Access Permission - Landowners / Occupiers
    • Signage & Public Notification
  • Current Operations
    • Aerial 1080 Operations >
      • Completed Aerial 1080 Operations
    • Ground Operations - Animal Pests
  • Health & Safety
  • Quality Assurance
  • Contact

Current aerial control operations.

Aerial Control 2020-21

Please scroll down to see more information about each project listed below. 
  • Aorere
  • St Arnaud
  • Buller South​
Quick link:  Completed Aerial Operations

​2020/21 Aorere Aerial

Location:  Buller & Tasman districts
Permission area:  50,500 hectares (approx.)


​Click here to view the factsheet for this project.
Click here to view the public notice for this project.
Client:  Department of Conservation
Status:  This operation has been split into eastern and western blocks which may be delivered at different times.  Refer table below for status of each block.
Eastern block
Western block
​Non-toxic prefeed application in the eastern portion of the Aorere project area was completed 27/07/2020.
 

1080 application in the eastern portion of the Aorere project area was completed on 16/08/2020 & 17/08/2020.
Non-toxic prefeed application in the western portion of the Aorere project area was completed 04/08/2020.
​
​
1080 application in the western portion of the Aorere project area was completed on 16/08/2020 & 17/08/2020.
Picture

​2020/21 St Arnaud Aerial

Location:  Tasman District
Permission area:  36,391 hectares


​Click here to view the consultation factsheet for this project.
​Click here to view the notification factsheet for this project.
Client:  Department of Conservation
Status:  1080 application in the St Arnaud project area was completed on 08/09/02020.

Picture

2020/21 Buller South Aerial

Location:  Buller District
Permission area:  21,200 hectares (approx.)

​
​Click here to view the factsheet for this project.
Click here to view the public notice for this project.
Client:  TBfree New Zealand
Status:  1080 application in the Buller South block was successfully completed on 11/08/2020.
Picture
Knowledge, Skill, Integrity, ​​Sensitivity, Sustainability
Picture
Page updated 18/08/2020 
Photographs supplied by Matt Winter
​www.wildnaturenewzealand.co.nz
Instagram  -  ‘wildnaturenewzealand’
Youtube   -  ‘Into the Wind - Matt Winter Photography’
Proudly powered by Weebly
  • Home
  • About Us
    • Vision , Mission & Values
  • Why Us?
  • Services
    • Control methodology
    • Access Permission - Landowners / Occupiers
    • Signage & Public Notification
  • Current Operations
    • Aerial 1080 Operations >
      • Completed Aerial 1080 Operations
    • Ground Operations - Animal Pests
  • Health & Safety
  • Quality Assurance
  • Contact